Assembly

Before beginning assembly, carefully read the following information and instructions:

Place all parts in a cleared area and remove the packing materials from the spa shell. Do not dis- pose of the packing materials until assembly is completed and the spa is operating.

During assembly, make sure that all parts are oriented as shown in the drawings.

Read each assembly step before you begin.

Tighten all parts as you assemble them, unless instructed to do otherwise.

ASSEMBLY REQUIRES THE FOLLOWING TOOLS (not included):

• One phillips screwdriver

A wire connector is provided on the electronics pack of the spa to connect a minimum No. 6 AWG (13.3 mm2) solid copper conductor between the spa and any metal equipment, electrical enclosure made of metal, metal water pipes, or conduit within five feet of the spa.

1.Before beginning assembly, make sure that you have read and understand the information in the above and on the previous two pages.

Remove the four #10 x 2” Machine Screws (46) that secure the indicated Access Panel (25) to the spa. Carefully remove the Access Panel and set it aside.

Be careful not to damage the spa shell.

2. Close the valve knob on the drain hose. Thread the

cap onto the drain hose.

Locate the four gate valves inside the access open-

ing (there are two gate valves per pump). Make sure

that the gate valves are open and that the locking

1

Spa Shell

46

25

46

2

clips are snapped onto the stems of the gate valves,

as shown in the inset drawing.

Make sure that the six collars are tightened (there

are two collars per pump and two on the heater).

Refer to step 1. Re-attach the Access Panel (25) to

the spa.

Locking Clip

Gate Valve

Drain

Hose

Collar

Cap Valve

Knob

8

Page 8
Image 8
ProForm PFSB73930 user manual Assembly, Be careful not to damage the spa shell