3. | Identify the Right Upright (83), which is marked | 3 |
|
|
|
|
|
| with a sticker. |
|
| 83 |
|
| |
| Have a second person hold the Right Upright |
|
|
|
|
| |
| (83) near the Base (90). See the inset drawing. | 84 |
|
|
| 84 |
|
| Tie the wire tie in the Right Upright securely | Wire Tie |
|
|
| ||
| around the end of the Wire Harness (84). Then, |
|
|
|
|
| |
| pull the other end of the wire tie until the Wire |
|
|
|
|
|
|
| Harness is routed completely through the Right |
|
|
|
|
|
|
| Upright. |
|
|
|
|
|
|
|
|
| 83 |
|
|
| 90 |
|
|
|
|
|
|
| |
|
| 84 | Wire |
|
|
|
|
|
|
| Tie |
|
|
|
|
4. Attach the Right Upright (83) to the Base (90) | 4 |
|
|
|
|
| |
| with a 3/8" x 3 1/2" Patch Bolt (8), a 3/8" x 1 1/2" | 83 |
|
|
|
| |
| Patch Bolt (6), and two 3/8" Star Washers (12) |
|
|
|
|
| |
| in the indicated locations. Be careful not to |
|
|
| 84 |
|
|
| pinch the Wire Harness (84). Partially tighten |
|
|
|
|
| |
| the Patch Bolts until the heads of the Patch |
|
|
|
|
|
|
| Bolts touch the Base; do not fully tighten the |
|
|
|
|
| 8 |
| Patch Bolts yet. |
|
|
| 12 | 6 | |
|
|
|
|
|
| ||
|
|
|
|
| 90 |
|
|
5. With the help of a second person, carefully tip | 5 |
|
|
|
|
| |
| the treadmill onto its right side. Partially fold the |
|
|
|
|
| |
| Frame (51) so the treadmill is more stable; do |
|
|
|
|
|
|
| not fully fold the Frame yet. |
|
| 51 |
|
|
|
| Attach two Wheels (91) to the Base (90) with a |
|
| 9 |
|
| |
| 3/8" x 2 3/4" Bolt (9) and a 3/8" Nut (13). Do not |
|
|
|
|
| |
| overtighten the Nut; the Wheels must turn |
|
|
|
|
|
|
| freely. |
| 90 | 91 |
|
|
|
|
|
|
|
|
| ||
|
|
|
| 13 |
|
| |
|
|
|
|
|
|
| |
|
| 8 |
|
|
|
|
|