Promise Technology J310S, J610S manual Mounting VTrak J610s in a Rack

Models: J610S J310S

1 60
Download 60 pages 12.73 Kb
Page 15
Image 15

Chapter 2: Installation

Mounting VTrak J610s in a Rack

The J610s subsystem installs to the rack using the supplied mounting rails. You can also use your existing rails.

Figure 3. VTrak J610s mounted in a rack with the supplied rails

Vertical Rack Post

VTrak J610s

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Handles mount

Mounting rails (included)

outside the rack post

mount outside the rack post

Cautions

At least two persons are required to safely lift, place, and attach the VTrak subsystem into a rack system.

Do not lift or move the VTrak subsystem by the handles, power supplies or the controller units. Hold the subsystem itself.

Do not install the VTrak subsystem into a rack without rails to support the subsystem.

Only a qualified electrician who is familiar with the installation procedure should mount and install the VTrak subsystem.

Be sure all switches are OFF before installing the VTrak subsystem or exchanging components.

To install the J610s subsystem into a rack with the supplied mounting rails:

1.Check the fit of the mounting rails in your rack system. See Figure 4.

2.Adjust the length of the mounting rails as needed.

3.Attach the mounting rail assemblies to the outside of the rack posts, using the attaching screws from your rack system.

Be sure the support is on the bottom facing inward.

11

Page 15
Image 15
Promise Technology J310S, J610S manual Mounting VTrak J610s in a Rack, VTrak J610s mounted in a rack with the supplied rails