INSTALLATION DIAGRAMS
HORIZONTAL / VERTICAL INSTALLATION PROCEDURES
1.Attach the brackets (a) to each side of the unit. Using the hex bolts with washers
(c).
2.Determine the mounting location and drill 4 mounting holes approximately 3.5mm in diameter .
3.Secure the unit in place using 4
e) | e) |
c) | c) |
e) | e) |
a) | a) |
ø3.5mm | ø3.5mm |
a) | a) |
c) | c) |
HORIZONTAL INSTALLATION
c)
e)
a)
d) b)
a)
b) c)
Attach the brackets (a) to each side of the unit using hex bolts with washers (c).
Attach the floor base plate (b) to the brackets a) using the wing nuts (d)
Lift the carpet and determine the mounting location. Fix the floor base plate (b) to the floor using
d)
d)
d)
d)
Press the unit to the floor, and remove the wing nuts (d), and lift off the changer
Lay down the carpet. Cut 1 “X” on each area of the carpet where the mounting bolts will pass through
Mount the unit in place, using 4 wing nuts (d)
7