Pre-Installation Checklist

Before beginning the actual installation, the Site Implementation Engineer must perform the following tasks:

Step 1. Check the packing list to verify all ordered equipment has been received. The box should contain:

❑A SilverStorm 9080 switch with the following pre-installed:

❑Four (4) fan units

❑Power supplies and blanks (6 total).

❑InfiniBand (IB) leaf modules (up to 8 total)

❑Spine modules and blanks (2 total)

❑Virtual I/O hardware such as the SilverStorm™ FibreChannel Virtual I/O Card (FVIC) and the SilverStorm™ Ethernet Virtual I/O Card (EVIC) (up to 4 total)

❑Any leaf/VIO hardware blanks (up to 7 total).

❑Additional parts:

❑One (1) Hardware installation kit (mounting rails, etc.)

❑One (1) Serial cable DB-9 female to RJ-11 connectors

❑One (1) Catefogy RJ-11 Serial cable

❑Power cords (up to 2 total)

NOTE: Be certain that the power cords are firmly seated into the SilverStorm 9080 power supplies AC power inlets.

❑A CD ROM containing:

❑Technical Documentation

❑Software

❑Release Notes.

Step 2. Unpack the equipment.

Step 3. Inspect the equipment for any shipping damage.

NOTE: Any shipping damage should be reported to the shipping company.