SilverStorm 9120

Quick Start Guide

Pre-Installation Checklist

Before beginning the actual installation, the Site Implementation Engineer must perform the following tasks:

Step 1. Check the packing list to verify all ordered equipment has been received. The box should contain:

A SilverStorm 9120 switch with the following pre-installed:

Four (4) fan units

Power supplies and blanks (6 total).

InfiniBand (IB) leaf modules (up to 12 total)

Spine modules and blanks (up to 3 total)

Virtual I/O hardware such as the SilverStorm™ FibreChannel Virtual I/O Card (FVIC) and the SilverStorm™ Ethernet Virtual I/O Card (EVIC) (up to 4 total)

Any leaf/VIO hardware blanks (up to 11 total).

NOTE: If using VIO hardware, in order to maintain AC redundancy, use the following configurations:

1 VIO card and 11 leaf modules.

2 VIO cards and 10 leaf modules.

3 VIO cards and a maximum of 7 leaf modules.

4 VIO cards and a maximum of 4 leaf modules.

NOTE: Once the AC Redundancy threshold has been exceeded, the SilverStorm 9120 must use a minimum of 4 power supplies and two power cords that must be plugged into a common, switched power source (e.g., a power strip).

Additional parts:

One (1) Hardware installation kit (mounting rails, etc.)

One (1) Serial cable DB-9 female to RJ-11 connectors

One (1) Catefogy RJ-11 Serial cable

Power cords (up to 2 total)

NOTE: Be certain that the power cords are firmly seated into the SilverStorm 9120 power supplies AC power inlets.

A CD ROM containing:

Technical Documentation

Software

1

Page 3
Image 3
Q-Logic 9120 quick start SilverStorm Quick Start Guide, Pre-Installation Checklist