Installation Tasks

NOTE: Before performing the installation tasks, take a few minutes to review the figures below. It is important to understand the slot numbering for the leaf modules and spine modules (and the corresponding spine RJ-45 ports). It is also important to understand the slot numbering for the fans and power supplies (and the corresponding AC power inlets for the power supplies).

Figure 1. SilverStorm 9120 Chassis Front View

Fan

Spine 3 (Unmanaged)

 

Fan

 

 

 

 

 

4

 

Spine 2 (Managed)

 

3

 

 

 

 

 

 

Spine 1 (Managed)

 

 

Fan

 

 

PS

PS

PS

Fan

2 PS

PS

PS

1

6

5

4

3

2

1

 

Figure 2. SilverStorm 9120 Chassis Back View

Leaf 11

Leaf 12

Leaf 9

Leaf 10

Leaf 7

Leaf 8

Leaf 5

Leaf 6

Leaf 3

Leaf 4

Leaf 1

Leaf 2

 

 

 

AC power inlet for power

 

 

AC power inlet for power

supplies 1 to 3

 

 

supplies 4 to 6

 

 

 

 

RJ-45 for Spine 1

RJ-45 for Spine 2

3

Page 5
Image 5
Q-Logic 9120 quick start Installation Tasks, Leaf