INSTALLING THE CHIMNEY HOOD
4. | Drill the holes for the fixing screws 5. | When the electrical connection has |
| using an 8mm masonry drill bit. Insert | been made, test the three speed fan |
| the rawl plugs and fix the brackets (2) | and the spotlams |
| using the 4.2 x 44.4mm screws |
|
provided.
DRILLING THE HOLES 1
1.Draw a horizontal line through the vertical 970mm up the wall from the top of the cooking appliance, ensuring it is level with a spirit level.
2.Mark the centres for the holes 1, 116mm either side of the vertical line.
3.Drill the two holes 1 for the fixing screws using an 8mm masonry drill bit. Insert the rawl plugs and the 4.2 x 44.4mm screws provided. Tighten the screws, leaving a space of
Note: If the chimney hood is to be installed onto a hollow construction plaster or partition board wall then special fixing
screws will be required (not supplied).
FIXING THE CANOPY
1.Before starting to fix the canopy to the wall, it is necessary to adjust the support brackets S1 by rotating the adjustment screws clockwise about half way through their length as illustrated opposite.
2.Hook the canopy C onto the two screws 1.
3.To level the canopy on the wall rotate the adjustment screws S1 until the canopy is level and then tighten up the wall fixing screws to secure the canopy to the wall.
4.Before fitting the chimney to the canopy make the electrical connection as described in the section titled
‘ELECTRICAL CONNECTION’.
12