Rayburn 200SFW, 212SFW installation instructions Testing And Commissioning, Firebrick Replacement

Models: 200SFW 212SFW

1 8
Download 8 pages 45.75 Kb
Page 7
Image 7
TESTING AND COMMISSIONING

TESTING AND COMMISSIONING

After completing the installation, the Heating Contractor should demonstrate to the user, the operation of the appliance and the routine flue operating method.

1.Check that the system is full of water and free from air pockets. (Rayburn Cookmaster Plus 212SFW only).

2.Select and install the appropriate burning grate as required by the customer (see Users Instructions for method).

3.When lighting pull the flue chamber damper open to maximum.

4.Add paper and sticks with a small quantity of fuel through the fuelling aperture onto bottomgrate and close the firebox door.

5.Open ashpit door, ignite fuel and close ashpit door when fuel is well alight with spinwheel on ashpit door at required setting.

(6. Allow the cooker to heat up gradually at first time lighting.

NOTE: The water capacity of the boiler is 7 litres.

FIREBRICK REPLACEMENT

The firebricks fitted to Rayburn Cookers are of first quality manufacture, and providing the cooker has been installed and used correctly will have a reasonable life. They are, however, expendable items and in time will require renewal.

The renewal of firebricks is not a major operation and can be carried out by the average person.

Replacement bricks either in sets or singly can be obtained from your Rayburn distributor.

LEAVE INSTRUCTIONS FOR FUTURE USE

7

Page 7
Image 7
Rayburn 200SFW, 212SFW Testing And Commissioning, Firebrick Replacement, Leave Instructions For Future Use