RCA L Version 2.0 14
4 Storage and transport

4.1 Storage

The partly pre-assembled door is delivered in a crate. An undamaged crate makes it p ossible
to store the door externally for some days.
The crate must be stored on even ground. The crate must not be
removed before the start of installation.

4.2 Dimensions of the fitted door

See technical drawings in the section 11

4.3 Devices and aids allowed for the transport

The door should be lifted in such a way that tilting the crate sideways is
avoided.

4.4 Transport to the installation place

The components of the door system must only be taken from the transport crate at the place
where the door is being installed.