RedMax AG2300 Operation,  10 , Installing Drill, Throttle Cable Adjustment, Starting Engine

Models: AG2300

1 24
Download 24 pages 62.13 Kb
Page 10
Image 10
Operation

Operation

Installing Drill

1.Slide the ring clip and remove the lock pin from the drill.

2.Put the drill onto the auger output shaft and insert the lock pin. Cover it with the ring clip.

Throttle Cable Adjustment

Check the throttle cable play and adjust to

.04 or .08 in. at the carburetor side.

Starting Engine

1.When first starting up after putting fuel into the machine, or when re-starting after running out of fuel, push the priming pump until fuel runs out the overflow pipe.

2.Close the choke (push the choke lever front ward).

3.While pulling the throttle lever, push in the throttle lock and set the throttle lever to the starting position.

NOTE

The throttle lock makes starting easier. Always use it when starting the engine.

5.While firmly holding the auger as illustrated, vigorously pull the starter rope.

6.When engine has ignited first, open the choke (move the choke lever backward), pull the starter rope again and the engine will start.

■Installing Drill■Throttle Cable AdjustmentWARNING

Keep the drill clear of everything around it as they will start moving with the engine start.

7.Pull the throttle lever slightly, and it will be unlocked automatically.

8.Allow the engine to warm up for a couple of minutes before starting operation.

NOTE

When re-starting immediately after stopping engine, keep the choke open.

If the engine won't start even after repeated attempts, it may be overfed with fuel. Remove and dry the spark plug, and try to start again with the choke open.

10

Page 10
Image 10
RedMax AG2300 manual Operation,  10 , Installing Drill, Throttle Cable Adjustment, Starting Engine