b) Pump

b) Pump

Check for faulty potentiometer

operates

switch, (located under knob

when motor

'A' inside front cover). Switch

is switched

should be open circuit when

off

turned fully anti-clockwise.

c)Water too Blockage in filter causing

hot

obstruction in water supply.

 

Check and clean (see page 10).

 

 

 

d)Water too Blockage in filter causing

cold

obstruction in water supply.

 

Check and clean (see page 10).

 

 

 

Diagram 5

2 metres, typical height for majority of users from top of riser rail to base of bath or cubicle

Diagram 6

e)Poor temperature adjustment

Check that the hot and cold water supplies are delivered to the correct ports.

Check that water is supplied to the shower unit at balanced pressures (ie. Hot and cold water are supplied from the same header tank). Ensure cold supply is not taken from mains.

2 metres typical height from top of riser rail to base of bath or cubicle

f)Unit does Check that the shower and all

not prime pipework are sited below the level of the cold water tank.

g)Poor flow Are there any restrictions in

rate

the 15mm supply (reduced

 

diameters even for short

 

distances).

 

Is the pressure being lost to

 

other services in the dwelling.

 

Check filter for obstructions in

 

the water supply and clean if

 

necessary. See page 10 for

 

details.

 

 

REDRING AFTER SALES SERVICE

We offer a technical advisory service on the telephone to contractors and other customers with problems in the field.

Ring 0870 9000 430 (Normal Office Hours) Spare parts can be supplied against any VISA or Access cards.

Ring 0870 9000 420 (Normal Office Hours) Remember to quote the exact type of shower, as written on the front of the shower and on this leaflet. It may also be of use to have a note of the Catalogue Number as stated on the rating plate inside the shower (see diagram 2 for location)

INSTALLATION INSTRUCTIONS

The installation should be done by qualified personnel and checked by the Electricity Board.

WARNING: DO NOT INSTALL THE SHOWER IN A ROOM WHERE IT MAY BE SUBJECT TO FREEZING.

We recommend that the installation is done in the following sequence :-

A)Fixing the shower to the wall.

B)Plumbing.

C)Electrical connections.

A) Fixing the shower to the wall

The Redring Expressions Power Shower is fitted with a motor and some mechanical noise can be expected when in use. The type of wall structure will affect the noise levels. Solid walls will provide quieter operation than panel or stud partition walls.

1.Place the riser rail at the height recommended in diagrams 5/6 and mark its position.