OPERATION

IMPORTANT

A qualified person must perform the initial firing of the heater. At this time the user should not hesitate to ask the individual any questions which they may have in regard to the operation and maintenance of the unit.

An Operational Checklist is included on page 33 of this manual. By using this checklist the user may be able to make minor operational adjustments and avoid unnecessary service calls. However, the user should not attempt repairs which are not listed under the USER column.

General

NEVER OPERATE THE HEATER WITHOUT FIRST BEING CERTAIN IT IS FILLED WITH WATER AND A TEMPERATURE AND PRESSURE RELIEF VALVE IS INSTALLED IN THE RELIEF VALVE OPENING OF THE HEATER.

SHOULD OVERHEATING OCCUR OR THE GAS SUPPLY FAIL TO SHUT OFF, TURN OFF THE MANUAL GAS CONTROL VALVE TO THE APPLIANCE.

Before proceeding with the operation of the unit make sure the water heater and system are filled with water and all air is expelled.

Filling

1.Close the heater drain valve by turning handle clockwise.

2.Open a nearby hot water faucet to permit the air in the system to escape.

3.Fully open the cold water inlet pipe valve allowing the heater and piping to be filled.

4.Close the hot water faucet as water starts to flow.

5.The heater is ready to be operated.

THE GAS VALVE MUST HAVE BEEN IN THE OFF POSITION FOR AT LEAST 5 MINUTES. This waiting period is an important safety step. Its purpose is to permit gas that may have accumulated in the combustion chamber to clear. IF YOU DETECT GAS ODOR AT THE END OF THIS PERIOD DO NOT PROCEED WITH LIGHTING. RECOGNIZE THAT GAS ODOR, EVEN IF IT SEEMS WEAK, MAY INDICATE PRESENCE OF ACCUMULATED GAS SOMEPLACE IN THE AREA WITH RISK OF FIRE OR EXPLOSION. SEE THE FRONT PAGE FOR STEPS TO BE TAKEN.

All gas and water lines must be leak tested and open.

Read SEQUENCE OF OPERATION section of this manual prior to lighting and operating this appliance.

With above conditions satisfied, start the unit in accordance with the instructions on the operating label attached to the heater. For your convenience a copy of the instructions are shown on page

24.Each heater is equipped with an ignition control board. The controller will try three times to light the main burner before going into lockout. After the controller tries three times, it will wait one hour before trying to light the unit again. This cycle will continue until the main burners are ignited or the unit is shut down.

ADJUSTMENTS

ON INITIAL STARTUP SOMEADJUSTMENTSARE NECESSARY.

1.CHECK MANIFOLD AND INLET GAS PRESSURES.

2.CYCLE CHECK - CHECK AT LEAST ONE BURNER OPERATION - WHEN THERMOSTAT IS SATISFIED, BURNER WILL SHUT OFF AND INDUCER WILL STOP RUNNING. ON CALL FOR HEAT - THE INDUCER WILL COME ON AND CLOSE THE PRESSURE SWITCH AND THE IGNITION SEQUENCE DESCRIBED ABOVE WILL BEGIN, SEE “SEQUENCE OF OPERATION”.

SEQUENCE OF OPERATION

The following information will describe the Sequence of Operation for this appliance.

1.Switch power on to unit.

2.Thermostat calls for heat.

3.Ignition Control Board performs diagnostic check on system components.

4.On completion of diagnostics check, the Ignition Control Board sends signal to Exhaust Inducer.

5.Exhaust Inducer begins drawing air through appliance closing the Prover Switch.

6.On completion of Prover Switch engagement, the Ignition Control Board begins the ignition cycle.

7.The Ignition Control Board provides power to the Silicon Nitride Ignitor.

8.The Silicon Nitride Ignitor heats up for approximately 17 to 20 seconds.

9.At the end of Silicon Nitride Ignitor’s warm-up, the Ignition Control Board opens the Gas Valve.

10.From the time the Gas Valve opens, the Ignition Control

Board waits 3 seconds and then shuts off power to the Silicon Nitride Ignitor.

11.From the time the Silicon Nitride Ignitor’s power is shut off, the Ignition Control Board waits 3 more seconds to monitor the Flame Sensor.

12.If the Flame Sensor does not detect a strong enough flame, the Ignition Control Board shuts off the Gas Valve and allows the Exhaust Inducer to purge the unit for 20 seconds. At that time, the Ignition Control Board restarts with step 7. It will try and ignite the main burners 2 more times. If the unit does not light, the Ignition Control Board will wait one hour and then restart at step 3. This cycle will continue until the unit lights or the power is shutoff to the unit.

13.If the Flame Sensor detects a strong flame, the Ignition Control Board will allow the unit to operate until the thermostat is satisfied.

14.Once the unit is satisfied, the Ignition Control Board will shut off the Gas Valve and the unit will be in standby mode until another call for heat is initiated by the thermostat.

See the flow chart on page 32 for more information.

23

Page 23
Image 23
Reliance Water Heaters D85500PE, D85500NE instruction manual General, Filling, Adjustments

D85500PE, D85500NE specifications

Reliance Water Heaters offers a diverse range of high-performance water heaters, with the D85500NE and D85500PE models standing out for their exceptional features and innovative technologies. Designed to meet the needs of modern households, these water heaters are engineered for efficiency, reliability, and ease of use.

The D85500NE is a natural gas water heater that boasts a 50-gallon capacity, making it an excellent choice for medium to large households. One of its main features is the Energy Factor (EF) rating, which ensures efficient operation and reduces energy costs. With a recovery rate of approximately 41 gallons per hour, it's capable of delivering a steady supply of hot water without delays, ensuring that families can enjoy uninterrupted use during peak demands.

The D85500PE model, on the other hand, operates using propane, catering to households with propane systems. Like its natural gas counterpart, the D85500PE also has a 50-gallon capacity and delivers a comparable recovery rate. Both models feature a glass-lined tank, providing corrosion resistance and extending the lifespan of the water heater. This protective lining is crucial for maintaining water quality and ensuring durability over time.

In terms of technology, both the D85500NE and D85500PE are equipped with advanced thermostat and burner systems that allow for precise temperature control. The integrated piezo ignition allows for easy start-up, enabling users to ignite the burner with a simple push of a button. Additionally, the water heaters are designed with safety features such as a pressure relief valve, which prevents excessive pressure build-up.

Another notable characteristic of these models is their user-friendly accessibility. Maintenance access is made simple with installation features that enable straightforward servicing and repairs. The compact design of the units also allows for versatile installation options, whether in a basement, garage, or utility closet.

Finally, both the D85500NE and D85500PE are backed by a solid warranty, providing peace of mind for consumers. With their combination of efficiency, reliability, and advanced features, these water heaters from Reliance Water Heaters are an outstanding choice for anyone looking to enhance their home’s hot water system.