Manuals
/
Reliance Water Heaters
/
Household Appliance
/
Water Heater
Reliance Water Heaters
RUF 100 199 SERIES 100, RUF 100 199 SERIES 101 warranty
Models:
RUF 100 199 SERIES 100
RUF 100 199 SERIES 101
1
33
36
36
Download
36 pages
16.01 Kb
29
30
31
32
33
34
35
36
<
>
Troubleshooting
Specification
Install
Replacement Parts
Warranty
Heater Wiring
Fault and Alert Conditions
Adjustment Procedure
U.S. Power Vent
Drain Valve And Access Panels
Page 33
Image 33
NOTES:
33
Page 32
Page 34
Page 33
Image 33
Page 32
Page 34
Contents
GAS-FIRED POWER BURNER FOR DOMESTIC HOT WATER
INSTALLATION OPERATION SERVICE MAINTENANCE LIMITED WARRANTY
RUF 100 199 SERIES 100 AND
COMMERCIAL GAS WATER HEATER
FOREWORD
RUF 100 199 ROUGH-IN-DIMENSIONS
Approx
Input
FEATURES
TABLE OF CONTENTS
WATER TEMPERATURE CONTROL
PAGE
HIGH LIMIT SWITCH E.C.O
INSTALLATION INSTRUCTIONS
DISHWASHING MACHINE REQUIREMENT
CIRCULATING PUMP
CLEARANCES
LOCATING THE HEATER
AIR REQUIREMENTS
HARD WATER
MECHANICAL EXHAUSTING OF ROOM AIR
UNCONFINED SPACE
INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS
U.S. DIRECT VENT
U.S. POWER VENT
DIRECT VENT TERMINAL INSTALLATION
INSTALLATION SEQUENCE
DIRECT VENTING
INSTALLATION SEQUENCE
VERTICAL VENT TERMINAL INSTALLATION
VENT PIPE PREPARATION
INSTALLATION OF VENT SYSTEM
Table 2. VENT LENGTH TABLE
Number
GAS PIPING
CONTROLS AND SWITCHES
BLOWER PROVER SWITCH
BLOCKED OUTLET PROVER SWITCH
CONNECTION OF GAS PIPE
PURGING
SYSTEM CONNECTIONS
GAS METER SIZE - CITY GASES ONLY
GAS PRESSURE REGULATION
HEATER WIRING
USING THE ELECTRONIC CONTROLLER 1.Overview
2. Operating States
3. Adjusting the Operating Set Point
ACTION
DISPLAY
6. Access to the Current Fault or Alert
5. Fault and Alert Conditions
Example of a Fault Advanced Diagnostics Information
4. Changing the Display Units
7. Viewing the Fault History
PRIOR TO START UP
8. Viewing Information About the Heater
REQUIRED ABILITY
ADJUSTMENT PROCEDURE
OPERATING INSTRUCTIONS
Initial Start-up
GENERAL INFORMATION
MAINTENANCE
PRECAUTIONS
POWER BURNER
FOR YOUR SAFETY READ BEFORE OPERATING
OPERATINGINSTRUCTIONS TURNOFFOFFGASTOTOAPPLIANCE
199 MODELS
FLUSHING
POWERED ANODE SYSTEM
DRAINING
SEDIMENT REMOVAL
RELIEF VALVE
DRAIN VALVE AND ACCESS PANELS
CIRCULATING PUMP
VENT SYSTEM
INSTALLATION DIAGRAMS
ONE TEMPERATURE - ONE HEATER VERTICAL STORAGE TANK FORCED CIRCULATION
WITH OR WITHOUT BUILDING RECIRCULATION
TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE
INSTALL IN ACCORDANCE WITH LOCAL CODES
WITH OR WITHOUT BUILDING RECIRCULATION
PIPE RELIEF VALVE TO OPEN DRAIN
WITH OR WITHOUT BUILDING RECIRCULATION
TWO TEMPERATURE - TWO HEATERS HIGH TEMPERATURE
TWO TEMPERATURE - THREE HEATERS TWO PRE-HEATERS/ONE BOOSTER HEATER
WITH OR WITHOUT BUILDING RECIRCULATION
TWO TEMPERATURE - TWO HEATERS ONE PRE-HEATER/ONE BOOSTER HEATER
WITH OR WITHOUT BUILDING RECIRCULATION
PIPE RELIEF VALVE TO OPEN DRAIN
TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE
WITH RECIRCULATION OF SANITIZING LOOP
DANGER
MANIFOLD KITS
TROUBLE-SHOOTING
CHECKLIST AND SERVICE INFORMATION
BURNER OPERATIONAL PROBLEMS
NOT ENOUGH OR NO HOT WATER
MOTOR WILL NOT RUN
REPLACEMENT PARTS
MOTOR RUNS, PREPURGE TIME ELAPSES BUT MAIN FLAME NOT ESTABLISHED
MOTOR RUNS, BURNER LIGHTS MOMENTARILY THEN LOCKS OUT
Page
Page
4. SERVICE AND REPAIR EXPENSES
MODEL RUF LIMITED WARRANTY
6. CLAIM PROCEDURE
KEEP THIS WARRANTY POSTED ADJACENT TO THE HEATER FOR FUTURE REFERENCE