RHEEM SOLAR WATER HEATER WARRANTY - AUSTRALIA ONLY
60
WARRANTY
Rheem will:
a) Repair or, if necessary replace any Rheem water heater; or
b) Replace any component (or, if necessary, arrange the installation of a new water heater),
which falls within the Warranty Periods specified below, subject to the warranty conditions and exclusions.
Installation Model Period Warranty
All Components (from date of installation)
All installations All models Year
1
New component, solar collector or water
heater (at Rheem’s sole discretion), free of
charge, including labour.**
Cylinder (from date of installation)
Years
2 & 3
New water heater, free of charge, including
labour.**
Loline
Premier Loline
Hiline Years
4 & 5
New water heater, free of charge, with
installation and labour costs being the
responsibility of the owner.
Water heater installed in a
“single-family domestic dwelling”
Premier Hiline Years
2 to 6
New water heater, free of charge, with
installation and labour costs being the
responsibility of the owner.
Water heater installed in any
other than a “single-family
domestic dwelling”
Loline
Premier Loline
Hiline
Premier Hiline
Years
2 & 3
New water heater, free of charge, with
installation and labour costs being the
responsibility of the owner.
Heat Exchanger Electronic Instantaneous Gas Booster (from date on installation)
Years
2 & 3
New heat exchanger, free of charge,
including labour.**
Water heater installed in a
“single-family domestic dwelling”
Premier Loline Years
4 & 5
New heat exchanger, free of charge, with
installation and labour costs being the
responsibility of the owner.
Solar Collector (from date of installation)
All installations
NPT200
S200
T200
Years
2 to 5
New solar collector, free of charge, with
installation and labour costs being the
responsibility of the owner.
Notes:
* Rheem is the supplier of Rheem electronic instantaneous gas water heaters, manufactured by Paloma
Industries, a world leader in water heater technology and manufacture.
** Refer to items 4 and 5 of warranty conditions.
Note: Every care has been taken to ensure accuracy in preparation of this publication. No
liability can be accepted for any consequences, which may arise as a result of its application.
Revision Date: 2007 April 126547A