OPERATION

OPERATION

The operator’s manual and safety signs affixed on the unit contain important instructions on the safe and proper use of the equipment. Maintain these important safety features on the implement in good condition to ensure the information is available to the operator at all times.

Ensure the manual canister is secured to the equipment with the operator’s manual inside.

Ensure all safety signs are in place and legible. Replace missing, damaged, and illegible decals. OPS-U- 0011

MOUNT ASSEMBLY

Inspect condition of mounting frame weldment.

Ensure all bolts and screws are in position and are properly torqued.

Ensure all pins are in place and fastened with screws.

Ensure frame is properly mounted to tractor and hardware is propely installed and tightened. OPS-L-0004

LOADER BOOM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of bushings at boom pivot points.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly. OPS-L-0005

Mount Frame Assembly

1594 01/11

Operation Section 4-14

© 2011 Alamo Group Inc.

Page 58
Image 58
Rhino Mounts 1594 manual Mount Assembly