Optional Piping for Circulation Systems

Optional Piping for Circulation Systems

For this application:

Pump should be controlled by an Aquastat, Timer or Combination Aquastat and Timer.

Pump to be sized to maintain circulation loop temperature.

A minimum of 3 GPM flow is recommended for the circulation system.

The pump should be sized to overcome the pressure loss through the Rinnai water heater, supply and return plumbing. Refer - ence the Rinnai Hot Water System Design Manual, Pump Sizing for Circulation.

Pump to be of bronze or stainless construc - tion.

Condensate drain line

Note: Water heater outlet temperature

Condensate

cannot be adjusted when

drain

circulation pump is running.

 

Minimum 3/4" Hot Water

 

Supply Line

 

 

(Optional)

 

2-6 Gallon

 

Storage Tank

 

(To eliminate cold water

 

sandwich effect caused by

 

frequent On/Off operation)

Building Fixture Outlets

NOTE:

For residential and commercial applications, this piping arrangement reduces the warranty to the following:

3 years on heat exchanger

3 year on parts

Full warranty will be maintained if an on-demand recirculation system in incorporated. Refer to the Limited Warranty.

Rinnai

 

Equipment List

QTY

Rinnai

1

Water Heaters

RIK-KIT (Optional)

1

(3/4" Fittings Include:

 

2

Unions, 2 Ball Valves,

 

2

Drain Valves and

 

1

Pressure Relief Valve.)

 

For this application:3 years on heat exchanger 3/4" Gas Connection

Gas Supply

Minimum 3/4 “ Cold Water Supply Line

Expansion Tank

 

KEY

3/4" Ball Valve

Pressure Regulator

 

3/4" Union

Circulating Pump

Check Valve

Boiler Drain Valve

Pressure Relief Valve

S Solenoid Valve

This is not an engineered drawing. It is intended only as a guide and not as a replacement for professionally engineered project drawings. This drawing is not intended to describe a complete system. It is up to the contractor/engineer to determine the necessary components and configuration of the particular system being installed. This drawing does not imply compliance with local building code requirements. It is the responsibility of the contractor/engineer to ensure installation is in accordance with all local building codes. Confer with local building officials before installation.

Manual - Rinnai Condensing Water Heaters

25

Page 25
Image 25
Rinnai RC80HPI Optional Piping for Circulation Systems, years on heat exchanger 3 year on parts, For this application