Assembly :
Preparation:
•Place the base on the floor and remove the water tank.
Install pole in main unit:
•Insert pole 1 and 2 according to the diagram to the right, ensuring the marks on the unit and the poles line up.
•Press pole firmly into place.
Locking the pole :
•With the poles inserted lay the base on its side.
•Turn the 2 lockbars on the base of the steamer 90° to secure the poles.
•Use a coin or similar object to turn the lockbar.
•After the poles are locked, pick up the unit and return to its use position.
Installing Integrated Hanger :
•Take the hanger with the brush hooks facing to the front.
•Check for correct orientation with the index marks matching.
•Insert both ends of the hanger into the pole connection and press both ends simultaneously into the pole until the hanger properly engages.
•If it is required to dismantle the pole from the main unit, tilt the appliance and unlock the pole first.
•Then place the appliance back into it’s upright position. Expand both poles to the desired height by unlocking them. Pulling them gently and locking them.
WARNING : unlock the four clips while keeping integrated hanger in your hand.
•Dismantling of the hanger from the poles by the customer is not foreseen.
Attaching Steam hose to main unit :
1)Insert hose plug into hose connector on main unit.
2)Fix hose connector by pulling clamping ring upwards.
Pole 1 | Pole 2 |
1
2
5