PREPARING THE INSTALLATION
Respect the clearances and maximum lengths indicated in the diagram below when installing the unit.
300 mm or more
300mm or more
125mm or more
Wrap the refrigerant pipes and the drain hose up in the absorbent pad and the vinyl tape, refer to page 13.
600 mm minimum
300 mm minimum
This drain direction is selectable to left or right.
15metres maximum
300mm minimum
7 metres maximum
600mm minimum