Sanyo C2432, CL2432 installation instructions Installation Site Selection

Models: CL2432 C2432

1 17
Download 17 pages 42.72 Kb
Page 4
Image 4
2. Installation Site Selection

1-6. Additional Materials Required for Installation

1.Refrigeration (armored) tape

2.Insulated staples or clamps for connecting wire (See local codes)

3.Putty

4.Refrigeration lubricant

5.Clamps or saddles to secure refrigerant tubing

2. Installation Site Selection

Indoor unit

Drain hose

Outside drainage

Fig. 1

2-1. Indoor Unit

WARNING

AVOID:

To prevent abnormal heat gen- eration and the possibility of fire, do not place obstacles, enclosures and grilles in front of or surrounding the air condi- tioner in a way that may block air flow.

6 inches

6 inches min. 6 inches

min.

min.

 

Front View

 

Fig. 2

direct sunlight.

nearby heat sources that may affect performance of the unit.

areas where leakage of flammable gas may be expected.

places where large amount of oil mist exist.

DO:

INDOOR

Tubing length (L)

UNIT

 

Elevation

OUTDOOR

difference (H)

UNIT

 

Fig. 3a

select an appropriate position from which every corner

of the room can be uniformly cooled. (High on a wall

is best.)

select a location that will hold the weight of the unit.

select a location where tubing and drain hose have

the shortest run to the outside. (Fig. 1)

allow room for operation and maintenance as well as

unrestricted air flow around the unit. (Fig. 2)

install the unit within the maximum elevation differ-

ence (H) above or below the outdoor unit and within a

CAUTION

For stable operation of the air conditioner, do not install wall-mounted type indoor units less than 5 ft. from floor level.

Indoor unit

Wall

Minimum height from floor level

5 ft.

total tubing length (L) from the outdoor unit as detailed

in Table 3 and Fig. 3a.

Table 3

Floor level

Fig. 3b

 

Max. Allowable Tubing

Limit of Tubing

Limit of Elevation

Required Amount of

Model

Length at Shipment

Length (L)

Difference (H)

Additional Refrigerant

 

(ft.)

(ft.)

(ft.)

(oz./ft.)*

 

 

 

 

 

C2432, CL2432

25

132

50

0.27

 

 

 

 

 

*If total tubing length becomes 25 to 132 ft. (max.), additional refrigerant (R22) charge of 0.27 oz./ft. is required. No additional charge of compressor oil is necessary.

3

Page 4
Image 4
Sanyo C2432, CL2432 installation instructions Installation Site Selection