9.Install the belt to the spindle pulley. When replacing the belt, see figure below.
BACK SIDE
IDLER PULLEY BLOWER
PULLEY
FRONT SIDE | SPINDLE | |
PULLEY | ||
IDLER PULLEY | ||
|
10.Install the new belt covers and secure. See items number 1 and number 21 on page 9 of the Blower Mounting Components secton in the Illustrated Parts List for proper installation.
11.Install the hopper mounting brackets to the outside of the frame on the rear of the machine.
See Figure 4.
Hopper
Mounting
Brackets
Rear Frame
Figure 4 A
Figure 4
12.Attach the hood assembly to the machine by installing the mounting post into the hopper mounting brackets and secure with the ring pins.
See Figure 5.
Figure 5
13.Install the hose from the blower assembly adapter to the hopper hood and secure using the
14.Install the bag assemblies.
15.Using the weight support bar as a guide, identify the four corresponding mounting holes, and the existing hardware that will need to be removed in order to secure the weight support bar to the front of the machine as shown. See Figure
16.Install one
Figure 5-A
17. Operate and test.
4