User interface inspection checklist

The user interface inspection verifies that the sensors and internal communication links are installed properly. Check that the outdoor heat exchanger is connected to the cooling unit and to the other cooling units in the room if you are using cooling group controls.

Ensure that:

An A-Link bus is connected to each cooling unit and a terminator is plugged into all unused A-Link connectors.

The input contacts and output relays are connected correctly.

The building management system is connected correctly and a terminator is wired into the final cooling unit.

The temperature sensors located on the front of the equipment are connected correctly.

The rack temperature sensors are installed correctly.

The network port is connected correctly and an IP address has been assigned to the cooling unit.

The optional rope water detection device is installed properly.

Start-up inspection checklist

The start-up inspection ensures that the equipment is operating properly after the initial start-up. This inspection verifies that all modes of operation are working correctly and that the cooling unit is ready for normal operation.

While the equipment is operating, ensure that:

The cooling unit is free from malfunctions, including chilled water leaks, unusual vibrations, or other irregularities, in each mode of operation.

The current draw of fan motors and transformers for the cooling operation is within the ratings of the respective circuit breakers.

Record the current at the main power connection of the main circuit breaker.

Record all current draws on the load side of any circuit breakers used for each device.

Compare the circuit breaker setting for each device to the actual current measured and the full load amps of the device to verify that the current draws are acceptable.

Feed B can supply power to all functions in the equipment.

The cool cycle engages.

The correct water outlet temperature sensor is positioned in connector J23.

Air filters are clean and free of debris. Replace air filters as needed.

The clogged filter alarm is operating properly. Cover 1/3 of the filter area to initiate the alarm.

Final inspection checklist

The final inspection verifies that the system is clean, and the start-up form has been sent to Schneider Electric.

Ensure that:

The system is clean and free from debris.

Packaging materials are disposed of properly.

The start-up form was completed and sent to Schneider Electric.

InRow RC Operation and Maintenance Manual

7

Page 13
Image 13
Schneider Electric ACRC502 User interface inspection checklist, Start-up inspection checklist, Final inspection checklist

ACRC501, ACRC502, ACRC500 specifications

Schneider Electric, a global leader in energy management and automation, has introduced its sophisticated line of edge computing solutions, namely the ACRC500, ACRC501, and ACRC502. These models are designed specifically to meet the increasing demand for efficient and reliable edge computing environments across various industries.

The ACRC500 serves as a compact and versatile solution that caters to small to medium-sized applications. It is engineered to optimize performance by utilizing advanced thermal management technologies. With a scalable architecture, the ACRC500 can easily be adapted for diverse workloads, making it ideal for facilities requiring quick deployment and efficient operation.

Meanwhile, the ACRC501 provides enhanced performance capabilities with increased processing power and memory. This model incorporates state-of-the-art technologies such as edge analytics and artificial intelligence, allowing businesses to make data-driven decisions in real time. Its robust design ensures it can withstand harsh environmental conditions, making it suitable for industrial settings. The ACRC501 also features advanced security protocols, ensuring sensitive data is safeguarded against potential cyber threats.

The ACRC502 stands out with its focus on high-density applications, offering improved data handling and processing efficiency. This model supports a wide range of connectivity options including Wi-Fi, Ethernet, and cellular networks, ensuring seamless integration into existing infrastructure. Its modular design allows for easy upgrades and scalability, making it a future-proof investment for enterprises looking to expand their edge computing capabilities.

All three models—ACRC500, ACRC501, and ACRC502—are built on Schneider Electric's EcoStruxure platform. This innovation enables real-time monitoring and analytics, facilitating proactive maintenance and reducing downtime. Furthermore, they support IoT applications, making them ideal for smart factory implementations, healthcare analytics, and energy management systems.

In addition to their high-performance features, these edge computing solutions are designed with sustainability in mind. Schneider Electric emphasizes energy efficiency and reduced carbon footprints in their development processes, aligning with global sustainability goals. The result is a suite of products that not only enhance operational efficiency but also contribute to a more sustainable future for businesses.

In conclusion, the ACRC500, ACRC501, and ACRC502 represent Schneider Electric's commitment to innovation in edge computing. With their array of features and technologies, these models are poised to meet the evolving needs of industries across the globe, driving the future of operational efficiency and sustainability.