Carrier 48HJD005-007 START-UP CHECKLIST Remove and Store in Job File, I. Preliminary Information

Models: 48HJD005-007

1 48
Download 48 pages 50.36 Kb
Page 48
Image 48
START-UP CHECKLIST

START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

MODEL NO.:________________________________

SERIAL NO.: ________________________________________

DATE:______________________________________

TECHNICIAN: _______________________________________

 

BUILDING LOCATION: _______________________________

II.PRE-START-UP (insert checkmark in box as each item is completed)

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

CHECK GAS PIPING FOR LEAKS

CHECK THAT RETURN INDOOR-AIR FILTER IS CLEAN AND IN PLACE

￿VERIFY THAT UNIT INSTALLATION IS LEVEL

CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III. START-UP

ELECTRICAL

 

 

 

 

 

SUPPLY VOLTAGE

L1-L2

 

L2-L3

 

L3-L1

COMPRESSOR AMPS

L1

 

L2

 

L3

INDOOR-FAN AMPS

L1

 

L2

 

L3

TEMPERATURES

 

 

 

 

 

 

 

 

OUTDOOR-AIR TEMPERATURE

 

 

DB

 

 

RETURN-AIR TEMPERATURE

 

 

DB

WB

COOLING SUPPLY AIR

 

 

 

 

 

 

 

 

GAS HEAT SUPPLY AIR

 

 

 

 

 

 

 

 

PRESSURES

 

 

 

 

 

 

 

 

GAS INLET PRESSURE

 

 

 

IN. WG

 

 

GAS MANIFOLD PRESSURE

 

 

 

IN. WG (HI FIRE)

REFRIGERANT SUCTION

 

 

 

PSIG

 

 

°F

REFRIGERANT DISCHARGE

 

 

 

PSIG

 

 

°F

￿VERIFY REFRIGERANT CHARGE USING CHARGING TABLES

VERIFY THAT 3-PHASE SCROLL COMPRESSOR ROTATING IN CORRECT DIRECTION

Copyright 2000 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book

1

4

PC 111

Catalog No. 534-767

Printed in U.S.A.

Form 48HJ-18SI

Pg CL-1

9-00

Replaces: 48HJ-17SI

Tab

1a

6a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - CUT ALONG DOTTED LINECUT ALONG DOTTED LINE

Page 48
Image 48
Carrier 48HJD005-007 START-UP CHECKLIST Remove and Store in Job File, I. Preliminary Information, Iii. Start-Up, Pressures