Section 2. Operating Procedures

4. Run the Laminator

1.Lower Draw Down Assembly and secure locking pins.

2.Align right and left Dam Stop brackets into position at the edges of the media. The inner brackets align with the outer edges of the media and lock down by turning the red knob on top of the bracket. The outer brackets position similarly next to the inner brackets with the bracket roller sealing against the bottom of the media. Tighten in place with the red knob on the side of the bracket.

3.Open the Flow Control valves on the applicator Nozzle and begin filling the reservoir between the Dam Stops.

Figure 2.4 Applicator Nozzle

4.Once coating is spanning between the two dam stops, lower the Dryer Assembly to the Down position.

5.Turn the Speed Control knob to the desired speed setting.

14

Page 15
Image 15
SEAL AS-1600 operation manual Run the Laminator, Applicator Nozzle