OPERATION

Tractor PRE-OPERATION Inspection

Tractor ID#______________________ Make____________________

Date___________________________ Shift_____________________

Before conducting the inspection, make sure the tractor engine is off, all rotation has stopped and the tractor is in park with the parking brake engaged. Make sure the loader is resting on the ground or securely blocked up and all hydraulic pressure has been relieved.

 

Item

Condition at

Specific Comments if

 

Start of Shift

not O.K.

 

 

 

 

 

 

 

The flashing lights function properly

 

 

 

The SMV Sign is clean and visible

 

 

 

The tires are in good condition with proper pressure

 

 

 

The wheel lug bolts are tight

 

 

 

The tractor brakes are in good condition

 

 

 

The steering linkage is in good condition

 

 

 

There are no visible oil leaks

 

 

 

The hydraulic controls function properly

 

 

 

The ROPS or ROBS Cab is in good condition

 

 

 

The seatbelt is in place and in good condition

 

 

 

The 3-point hitch is in good condition

 

 

 

The drawbar pins are securely in place

 

 

 

The PTO master shield is in place

 

 

 

The engine oil level is full

 

 

 

The brake fluid level is full

 

 

 

The power steering fluid level is full

 

 

 

The fuel level is adequate

 

 

 

The engine coolant fluid level is full

 

 

 

The radiator is free of debris

 

 

 

The air filter is in good condition

 

 

 

Operator’s Signature:

 

 

 

 

 

 

 

 

DO NOT OPERATE an UNSAFE TRACTOR or FRONT END LOADER

5211 01/11

Operation Section 4-15

© 2011 Alamo Group Inc.

OPERATION

Page 63
Image 63
Servis-Rhino 5211 manual Do not Operate an Unsafe Tractor or Front END Loader