Servis-Rhino 5211 manual Operation

Models: 5211

1 108
Download 108 pages 17.91 Kb
Page 79
Image 79
Manual background

OPERATION

Another method for large dirt piles is to build a ramp approach to the pile.

It is important to keep the bucket level when approaching a bank or pile. This will help prevent gouging the work area.

5211 01/11

Operation Section 4-31

© 2011 Alamo Group Inc.

OPERATION

Page 79
Image 79
Servis-Rhino 5211 manual Operation