Maintenance & Care
Maintenance Schedule
Components | Daily | Weekly | Pre Season | |
| (or after 20Ha) | (or after 75Ha) | (or 500 Ha) | |
Seeders/Agitators/Bottom Flaps | • | • | • | |
Wheel Nuts |
| • | • | |
Wheel Leg Pivots |
| • | • | |
Roller Chains |
| • | • |
|
Drive Cassettes |
| • | • | |
Gearbox (Oil level) |
| • | • | |
Tyre Pressure (25psi / 1.8bar) |
| • | • | |
Wheel Bearings |
| • | • | |
Bolted Connections |
|
| • |
|
Seed/Fertiliser Tubes |
|
| • |
|
Framewok |
|
| • | |
|
|
|
|
|
1 Bolted Connections
All bolted connections of the machine should be checked after the first 30 hours of operation and retightened if necessary and thereafter at regular intervals. It is suggested that this is done every 500 hectares or annually, whichever occurs first.
2 Gearbox
The oil level in the gearbox can be seen in the oil gauge window (1). Changing the gearbox oil is normally not necessary. For refilling the oil remove the 1/2” BSP plug on the top face of the gearbox (2), Castrol Oil Agri Trans Plus should be used. The total filling capacity is 1.25 litres (refer Fig 18).
DO NOT OVERFILL.
21
Fig 18
Pt. No. 67372 Issue 0806
27