SharkRack Enclosure Installation Guide

Installing a Typical 19 inch EIA Power Strip

Step

Detail

1. Secure to the Cabinet Mounting Rails

1a. (As required) Install 10-32 cage nuts. Some mounting rails require the use of cage nuts; install them into the appropriate holes as shown.

Or

Or

Install 10-32 clip nuts as shown. Some mounting rails require the use of clip nuts; install them into the appropriate holes as shown.

Figure 30

1b. (As required) Adjust the mounting brackets orientation.

Remove the hardware from the brackets as required. Rotate the mounting brackets as required. Reinstall the hardware.

Figure 31

1c. Secure the strip using (6) 10-32 x 1/2 inch panhead screws.

1d. Connect necessary cables.

Figure 32

ID-00210-000

REV D, ECO2773

Page 29 of 46