SharkRack Enclosure Installation Guide
Installing a Typical 19 inch EIA Power Strip (cont.)
Step | Detail |
3. Secure to the SharkTRAC™ using screws
3a. Install
Figure 34
Cage Nut instillation
3b. (As required) Adjust the mounting brackets orientation.
Remove the hardware from the brackets as required. Rotate the mounting brackets as required. Reinstall the hardware.
Figure 35
Mounting Bracket
3c. Secure the strip using (6)
3d. Connect necessary cables.
Figure 36
PDU installation
REV D, ECO2773 | Page 31 of 46 |