Standby Generator Sets

Maintenance

MAINTENANCE PERFORMED BY SERVICE FACILITIES

Before working on the generator, ensure the fol- lowing:

The AUTO/OFF/MANUAL switch is in the OFF position.

The 15A fuse has been removed from the con- trol box.

The 120VAC supply to the battery charger is switched OFF.

‹EVERY THREE MONTHS

1.Check battery condition.

2.Inspect and test fuel system.

3.Check transfer switch.

4.Inspect exhaust system.

5.Check engine ignition system.

6.Check fan belts.

‹ONCE EVERY SIX MONTHS

1.Test Engine Safety Devices (low oil pressure, low coolant level, high coolant temperature).

‹ONCE ANNUALLY

1.Test engine governor; adjust or repair, if needed.

2.Clean, inspect generator.

3.Flush cooling system.

COOLING SYSTEM

Air intake and outlet openings in the generator com- partment must be open and unobstructed for contin- ued proper operation. This includes such obstruc- tions as high grass, weeds, brush, leaves and snow.

Without sufficient cooling and ventilating air flow, the engine/generator quickly overheats, which causes it to shut down. (See the installation diagram.)

The exhaust system parts from this product get extremely hot and remains hot after shutdown. High grass, weeds, brush, leaves, etc. must remain clear of the exhaust. Such materials may ignite and burn from the heat of the exhaust system.

OVERLOAD PROTECTION FOR ENGINE DC ELECTRICAL SYSTEM

Engine cranking, start up and running are controlled by a solid state Engine Controller circuit board. Battery voltage is delivered to that circuit board via a 15 amp fuse. These overcurrent protection devices will open if the circuit is overloaded.

If a circuit breaker opens or a fuse element melts, find the cause of the overload before resetting the circuit breaker or replacing the fuse.

‹FIRST 30 OPERATING HOURS

1. Change engine "break-in" oil and filter.

‹FIRST 100 OPERATING HOURS

1.Change engine oil and oil filter. After initial change, service engine oil and filter at 100 operat- ing hours or six months, whichever comes first.

2.Retorque cylinder head.

3.Retorque intake and exhaust manifold.

‹EVERY 500 OPERATING HOURS

1.Service air cleaner.

2.Check starter.

3.Check engine DC alternator.

CHECKING FLUID LEVELS

‹CHECK ENGINE OIL

Check engine crankcase oil level (Figure 10.1) at least every 20 hours of operation, or prior to use.

Remove oil dipstick and wipe dry with a clean, lint- free cloth.

Install oil dipstick, then remove again.

Oil should be between FULL and ADD marks.

If oil level is below the dipstick ADD mark, remove oil fill cap-. Add the recommended oil to bring oil level up to the FULL mark. DO NOT FILL ABOVE THE “FULL” MARK. See “Engine Oil Recommen- dations” for recommended oils.

‹EVERY 800 OPERATING HOURS

1.Retorque cylinder head.

2.Retorque intake and exhaust manifold.

3.Check engine compression.

4.Check valve clearance.

10-1

05/06 B .Rev Maint011

Page 16
Image 16
Siemens SG020 owner manual Maintenance Performed by Service Facilities, Cooling System, Checking Fluid Levels

SG020 specifications

Siemens SG020 is a cutting-edge turbine designed for a variety of energy applications, particularly in the field of renewable energy generation and industrial processes. As one of the latest innovations from Siemens, this turbine is engineered for efficiency, reliability, and environmental sustainability.

One of the main features of the SG020 is its advanced aerodynamic design. This turbine is built with large rotor blades that optimize wind capture, allowing it to function effectively even in low-wind conditions. The blades are also constructed from lightweight composite materials, enhancing both performance and durability. This design maximizes energy output while minimizing wear and tear, thereby extending the operational lifespan of the turbine.

Incorporated within the Siemens SG020 is an intelligent control system that utilizes state-of-the-art sensors and software algorithms. This technology continuously monitors wind conditions and turbine performance, automatically adjusting the blade pitch and rotor speed to optimize energy production. The smart grid capabilities of the turbine allow it to integrate seamlessly with existing energy systems, making it a flexible solution for various applications, from powering remote communities to integrating with larger industrial facilities.

Another key characteristic of the SG020 is its commitment to sustainability. The turbine is designed to operate with minimal environmental impact, producing clean energy while reducing carbon emissions. Siemens has implemented eco-friendly manufacturing processes and materials in the production of the turbine, underlining the company’s dedication to environmentally responsible energy solutions.

Maintenance of the SG020 is also streamlined through innovative technology. Predictive maintenance features leverage data analytics to anticipate potential issues before they arise, allowing for timely interventions that further reduce downtime and maintenance costs. This enhances the overall reliability of the turbine, making it a dependable choice for energy generation.

The SG020 stands out as a flexible and efficient solution for delivering renewable energy. With its advanced technologies, robust design, and commitment to sustainability, it represents Siemens’ ongoing pursuit of innovation in the energy sector, paving the way for a more sustainable future in power generation.