Figure 1 -Overall Dimensions
OUTSIDE COMBUSTION AIR IS MANDATORY IN MOBILE OR MODULAR HOME INSTALLATIONS.
CAUTION: DO NOT CONNECT TO ANY AIR DISTRIBUTION DUCT OR SYSTEM .
VENTING AND INSTALLATION
CLEARANCES
CONTACT LOCAL BUILDING OFFICIALS ABOUT RE- STRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA.
A LISTED, 4" MINIMUM TYPE "L" PELLET VENT PIPE IS MANDATORY ON ALL INSTALLATIONS.
DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTEM OF THIS UNIT, DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.
Use only listed 4" minim um Type "L" pellet vent and com ponents for installation. The exhaust vent system
m ust be attached to the unit and to each adjoining section. All joints for connector pipe shall be fastened with at least three screws. If vented horizontally, joints shall be m ade
m aterial specified by vent pipe manufacturer. Failure to use listed pellet vent pipe or install it per manufacturers instructions will void your warranty.
INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENT MANUFACTURER
Vent Pipes’ inner and outer diameters may vary. Check with vent pipe manufacturer for further details.
PELLET HEATERS REQUIRE A MINIMUM 5' VERTICAL RISE FOR PROPER OPERATION. ADDITIONAL RISE OF 2' FOR EVERY 1' HORIZONTAL BEYOND 1 ½'. MINIMUM DRAFT REQUIRED IS
CONNECTION.
LOW DRAFT CONDITIONS RESULT IN OVERFEEDING AND POOR COMBUSTION.
Figure 2
WARNING: Installation of a Mobile Home Attachment Kit P/N 10412 and outside combustion air is mandatory in mobile or modular home installations although it may
also be used in all residential applications.
An outside air inlet MUST be provided for combustion
and ventilation air. The air inlet must rem ain unrestricted while unit is in use. Outside air connection is located in the rear of the heater (Figure 2). Use conduit pipe or metal flex pipe and/or fittings to make the air intake
CAUTION: STRUCTURAL INTEGRITY OF THE MOBILE HOM E FLOOR, WALLS AND CEILING/ROOF MUST BE MAINTAINED.
1.W hen deciding on the location of your heater and vent pipe, try to minim ize the alteration and refram ing of structural com ponents of the building. Vent pipe must be installed so that access is provided for inspection and cleaning.
2.Avoid installing heater in high traffic areas. Keep children well away from the heater when in operation.
3.A 4" clearance to combustibles must be maintained for horizontal and vertical venting. W hen passing through ceilings or walls, you must use a listed wall thim ble, making sure all combustible materials and insulation products are a m inim um of 3" away from the pellet vent pipe.
4.A
5.W hen installing the exhaust vent into an existing chim ney, a tee must be installed behind the heater before going up into the chim ney. This is necessary in order to rem ove fly ash accumulation.
6.Exit termination (distance to openings):
a.3 ft. minim um above any forced air inlet located within 10 ft.
b. 4 ft. minim um below and horizontally or 1 ft. minim um above any door, window or gravity air inlet into any building.
2