Cover Assembly
Figure 17. Install Connecting Sleeve | Figure 18. Install Straight Rod |
A. Connecting Sleeve | A. Straight Rod |
B. Support Tube |
|
C. Sleeve Clamp |
|
| |
D. Truss Head Screw, |
|
E. Nyloc Nut |
|
6.Install the sleeve clamp (C, Figure 17) to the connect- ing sleeve (A) with
7.Thread the straight rod (A, Figure 18), which has an eyelet on each end, through the sleeve at the front of the cover.
8.Pinch the black cord loop (B, Figure 19) and thread it through the eyelet on each end of the rod. Next, pull the loop over the top bolt (C) on each side of the box. The rod gives added support to the cover at the front of the box.
9.Inside the cover at the front, there is a long tab with an eyelet on the end. Pull this tab over the top of the support tube (A, Figure 20) and back under the sup- port tube before threading it through the slot in the cover. This locking tab (B) secures the cover to the support tube when the cover assembly is locked into the open position for dumping.
10.Install the six inch rubber strap (B. Figure 21) at the back of the box. Hook the strap over the metal loop
(A) on the frame rod, which protrudes through the cover. Close the hook with a pair of pliers. Hook the other end of the strap over the door lock (C) on the box.
Figure 19. Secure Cover
A. Straight RodC. Bolt
B. Cord Loop
Figure 20. Secure Cover To Support Tube
A. Support Tubes | B. Locking Tab |
|
|
|
|
Figure 21. Install Rubber Strap
A. Metal LoopC. Door Lock
B. Rubber Strap
8