Class 99 & 99K
Fig. 32 Raising the Bobbin Case Latch
Insert the forefinger of the left hand under the latch CC, Fig. 32, raise the latch just high enough to clear the edge
DDand then move the latch toward you.
Under no circumstances must the screw EE be loosened. The loosening of this screw will change the clearance for the thread between the bobbin case and the bobbin position bracket.
Page 27
Table of Contents Previous Page Next Page