Figure 2-6 Setup of WAN and Printer connections for this product.

4.Power on:

Connect the power cord to power inlet and turn the power switch on. The Barricade will automatically enter the self-test phase. When it is in this phase, the indicator M1 will light up for about 5 seconds, and then M1 will flash 3 times to indicate that the self-test operation is complete. Finally, the M1 will continuously flash once per second to indicate that this product is operating normally.

-9-

Page 10
Image 10
SMC Networks Barricade specifications Power on