ADDITIONAL CHIMNEY REQUIREMENTS
Chimney condition is of paramount importance for a safe and efficient boiler installation. All installations must include a chimney inspection by a qualified individual or agency. Chimney construction materials must be compatible with the fuel being used (See Figure 2.5A).
Particular attention should be paid on all
DANGER: A chimney which does not meet modern safety standards will result in a fire or deadly carbon monoxide poisoning of the building residents.
STEP 5: INSTALLING/TESTING GAS PIPING
Connect the gas piping from the meter to the boiler using a pipe size which will result in a pressure drop of less than 0.3" W.C. for natural gas or 0.5" W.C. for propane. See Figure 2.7 for the appropriate gas pipe sizing and example.
FIGURE 2.5: ATTACHING VENT DAMPER TO DRAFT DIVERTER & FLUE PIPE
MAKE SURE MOTOR IS
LOCATED ON FRONT SIDE
CLOSED OPEN
FLOW DIRECTION
FLOW DIRECTION ARROW POINTS UP (REAR VIEW)
MOUNT VENT DAMPER
OVER DRAFT DIVERTER
INSTALL SWITCH IN
OPENING
ON DRAFT DIVERTER
Good piping practices should be followed at all times. See FIGURE 2.5A: VENTING Figure 2.6 for a typical gas piping arrangement. All piping
must be supported by hangers, not by the boiler or its acces- sories.
Install a
Pipe joint compound (pipe dope) must be compatible with the fuel (natural gas or propane) being used.
FIGURE 2.6: TYPICAL GAS PIPING