Snapper 2-9693 dimensions Snapper Large Frame Snow Throwers

Models: 2-9693

1 2
Download 2 pages 6.06 Kb
Page 1
Image 1
SNAPPER LARGE FRAME SNOW THROWERS

ELECTRIC START SYSTEM DEALER SET-UP INSTRUCTIONS for

SNAPPER LARGE FRAME SNOW THROWERS

INTRODUCTION: It will be necessary to complete Dealer Set-Up Instruction #2-8224 first before attempting to install the electrical components described in this Electric Start System Dealer Set-Up Instruction.

WARNING: Always disconnect spark plug wire from spark plug before performing maintenance on snow thrower. DO NOT operate snow thrower without guards in place. DO NOT put hands into areas that house rotating parts while machine is in operation!

STEP 1: Drill two 5/16 diameter holes in right side of auger housing using dimensions shown. See Figure 1.

5/16 DIAMETER

HOLES AUGER HOUSING

3-7/16”

4”

4-5/16”

FIGURE 1

STEP 2: Drill two 5/16 diameter holes in control panel within the 5” by 7” boundary lines shown. Drill holes using dimensions shown. See Figure 2.

BOUNDARY

LINES

CONTROL

PANEL

5”

5-3/4”

7”

5/16 DIAMETER HOLES

FIGURE 2

STEP 3: Install light onto control panel with washer and nut and tighten securely. Install light wire harness into end of light wire and route down handle and secure with ties as shown. See Figure 3.

LIGHT

TIE

LIGHT WIRE

HARNESS

TIE

FIGURE 3

STEP 4: Remove battery mounting bracket and battery clamp from #6-0651 Battery Mounting Kit and assemble these parts as shown. See Figure 4.

BATTERY CLAMP

BATTERY MOUNTING

BRACKET

BEND TAB OVER

FIGURE 4

INSTRUCTION #2-9693 (I.R. 8/94)

Page 1
Image 1
Snapper 2-9693 dimensions Snapper Large Frame Snow Throwers