Axion / 150Z Series
TP 300-5412---ZT-SN 8/20086
Quick Setup List Page Setup Procedure Steps to Perform
7Uncrating ❏Remove crate & banding.
❏Place transmissions in ROLL RELEASE position & roll off
skid.
8Battery Activation &❏Charge the battery
(Note: proceed with other setup steps
Installation
while battery is charging).
❏Install & secure battery.
9-13 Mower Assembly ❏Install the seat.
❏Install the seat safety switch.
❏Set up the ground speed control levers.
❏Torque the mower blade hardware.
14 Check Fluid Levels ❏Fill & check Engine oil level.
❏Reduce & check tire pressures
(Front tires 18-20 psi, rear tires 10-12 psi).
15 Lubrication ❏Lubricate all grease & oil points.
16 Burnish PTO Clutch ❏Burnish PTO clutch
(run for 15 seconds, repeat 10 times)
.
16 SAFETY CHECKS ❏Perform SAFETY INTERLOCK SYSTEM CHECK.
❏Perform MOWER BLADE STOPPING CHECK.
(Blade must stop within 5 seconds!)