Section 5 - ADJUSTMENTS & REPAIR
5.10 MOWER SPINDLES (Field Serviceable Spindles) |
BEARING REPLACEMENT |
In the event that a spindle bearing requires |
replacement, the SNAPPER Field Serviceable |
Spindles have been designed so that no special |
tools or presses are required. |
1. Remove belt. Loosen blade nut and remove. |
Allow blade bolt, washer, blade and four spacers |
to drop down out of the spindle housing. See |
Figure 5.18. |
IMPORTANT: Spindle housing must be filled with grease before operating mower. Failure to fill housing will cause premature bearing failure.
REMOVE NUT
REMOVE BELT
FROM SPINDLE
REMOVE BLADE
BOLT
FIGURE 5.18
2. | Remove spindle pulley from spindle shaft. |
3. | Locate circular retaining ring on spindle shaft at |
top bearing. Remove retaining ring. Allow spindle | |
shaft to drop out of housing. | |
4. | Top and bottom bearings are now removable. |
Pull out on inner race to slide bearing from | |
housing. See Figure 5.19. | |
5. | Thoroughly clean all parts removing all old |
contaminated grease. | |
6. | Install new bottom bearing first. |
7. | NOTE: The bearing is sealed/shielded on one |
side only. The bottom bearing must be installed | |
with the sealed/shielded side DOWN. | |
8. | Insert spindle shaft up through the bottom |
BEARING
SEAL UP
BEARING SEAL DOWN
PULLEY
SPACER
NYLOS SEAL
RETAINING RING
BEARING
SPINDLE
HOUSING
SPACER
BEARING
SPINDLE SHAFT
bearing. Slide spacer down over spindle shaft. | |
9. Install new top bearing. Install the top bearing | |
with the seal/shield UP. | |
10. | Slide circular retaining ring down spindle shaft |
until it fully locks into groove on shaft. | |
11. | Apply a generous amount of |
grease to the concave side of the nylos seal. | |
Install the nylos seal with concave greased side | |
down. | |
12. | Place spindle pulley and spacer on top of |
spindle shaft. | |
13. | Reinstall blade bolt, washer, blade and four |
spacers. See Figure 5.14 | |
14. | Torque blade bolt and nut to 70 to 80 ft. lbs. |
15. | Pump grease into spindle housing until grease |
purges from vent on housing. | |
16. | After the first 5 hours of operation, grease |
spindle housing to insure it is full, then every 25 | |
hours. |
FIGURE 5.19
27