Lift discharge |
chute and slide |
bag over chute. |
Make sure bag |
noose fits over |
top of discharge |
chute and notch |
in chute bottom. |
Pull drawstring tight |
Figure 5A. Discharge Bag Installation
Assembly
Slide bag over dis- charge chute. Make sure bag noose fits over top of discharge chute and notch in chute bottom.
Pull drawstring tight
Figure 5B. Discharge Bag Installation-European model
HOPPER
1.Attach the hopper to the rotor housing, using care to engage the metal lip of the hopper liner to the inside of the housing as shown in figure 3.
2.Secure the hopper to the rotor housing using (2) 5/16 x 1/2 hex head bolts and (2) 5/16 flat washers. Do not tighten hardware at this time.
3.See figure 4. From the inside of the hopper, install (1)
4.Make sure the hopper is properly seated on the rotor housing, and then tighten all hardware securely.
DISCHARGE BAG
Your unit comes equipped with a bag for collecting debris as it exits the discharge chute.
See figures 5A & 5B for installation.
ENGINE OIL
Fill the engine oil sump with SAE 30 oil (5W30 for winter use). See page 16 for additional information and the location of the
7