Soleus Air GM-WAC-15ESE-C, GM-WAC-18ESE-C manual Assembly & Installation Cont, Fig. Top View

Models: GM-WAC-15ESE-C GM-WAC-18ESE-C

1 24
Download 24 pages 51.97 Kb
Page 11
Image 11
ASSEMBLY & INSTALLATION (CONT.)

ASSEMBLY & INSTALLATION (CONT.)

Top Angle Rail and Side Bracket Installation

1.Place the air conditioner on a hard flat surface.

2.Locate the foam gasket and top angle rail

3.Attach the foam gasket to the top angle rail

4.Install top angle side to cabinet as shown in FIG 7

Foam Gasket and Top

Top Angle Rail and Side Bracket Installation Angle Rail

FIG. 7

5.Slide the “I” section of the window panel into the side bracket of the cabinet (FIG. 8a ). Do this for both sides.

FIG. 9

TOP VIEW

Placing the Cabinet Inside the Window

1.Open the window and place the cabinet in the middle of the window sill.

2.Make sure the bottom rail is seated over the window sill as shown below. Bring the window down temporar- ily behind the top angle rail to hold the cabinet in place.

SILL

STOOL

ANGLE

FIG. 8a

6.Insert top and bottom legs of window filler panel frame into channel in the top angle and bottom rail. Do both sides. Install side retainer to cabinet as shown. FIG 8B- 9.

FIG. 8b

3.Fasten cabinet to window sill using two 7/8” Round

-Head screws. Pre-drill holes if needed. Add the bottom rail seal over the screws.

7/8” Round Head

Screw

10

Page 11
Image 11
Soleus Air GM-WAC-15ESE-C manual Assembly & Installation Cont, Top Angle Rail and Side Bracket Installation, Fig. Top View