Section 5 |
| Installation Wiring |
| ||
|
|
|
Section 5 – Installation Wiring
This section provides the details for connecting the system components together.
Power Supply Connections
This section refers to the following supplied cables (:
Description | SSL Part No. | qty |
Con IEC Free Socket 6A 2m | 32VGL362 | 2 |
Cable Power Digital 2m | 32VALXVX | 2 |
Lead Chassis Earth 16m | 66C93115 | 1 |
Notes
Centuri
Main & Redundant Console power Console to Centuri
a) Connect both the con sole’s Harting mains leads to in dependent mains supplies. For live tr ansmissions work it is r ecommended that on e of t he power sourc es will be from an
THE TWO POWER SOURCES MUST NOT BE FROM DIFFERENT PHASES OF A
b)Connect both the Centuri’s IEC leads to independent mains supplies. The Centuri crate is also fitted with
c)If specified, do not connect a source of power to the NetBridge until the voltage select switch position has been confirmed. The NetBridge operates at either 115V or 230V ranges and its power supply must be set to the appropriate range for the local supply.
Refer to the diagram on page 22 for the location of the voltage select switch.
d)Earth Wiring – A chassis to chassis earth cable needs to be installed between the console and the processor. This keeps the two earths at the same potential thus preventing currents flowing along the signal cables. Run the green chassis earth cable from the Con sole’s earth bolt to the similar earth bolt lo cated on the Centuri chassis.
Page 27