XR-M510
SECTION 3
DISASSEMBLY
•See page 3 for Servicing Notes.
Note: Follow the disassembly procedure in the numerical order given.
MECHANISM DECK (MG-25E-136)
1 screw (panel)
2 spacer (arm)
flexible board
Note: Don't pull out flexible board from front panel assy.
3 front panel assy
1 screw (panel)
2spacer (arm)
5 two screws (PTT2.6 ⋅ 6)
6mechanism deck
4connector (CN400)
4flexible board (CN401)
5two screws (PTT2.6 ⋅ 6)
10