Southern Pride manual BBR-700-FL VENTING INSTALLATION, Venting

Models: BBR-700-FL

1 2
Download 2 pages 61.78 Kb
Page 2
Image 2
BBR-700-FL

BBR-700-FL

VENTING INSTALLATION

VENTING:

The Model BBR-700-FL should be vented under a canopy hood rated for commercial cooking applications.

The oven’s minimum clearances from combustible materials are 18" on left side, 24" on right, 18" on top, 48" from front, and 2" on back. Minimum clearances 18" to chimney connector and to smoke extractor chimney connector. Floor may be constructed of a combustible material. (Note: minimum clearance dimensions are from the oven cabinet, not from component cover.) (If provision is made for access to service, minimum clearance can be reduced to 2" on left side.) May be installed through wall with zero clearance with BBR kit No. 2099.

ANY VENTILATION SYSTEM MUST BE INSTALLED IN ACCORDANCE

WITH LOCAL CODES. CONSULT WITH LOCAL OFFICIALS AND A COMMERCIAL

KITCHEN VENTILATION CONTRACTOR PRIOR TO INSTALLATION.

Southern Pride Distributing, L.L.C.

Phone: 618-997-9348

2102 East Main Street - Marion, Illinois 62959

Fax:

618-993-5960

www.southern-pride.com

sales@sopride.com service@sopride.com

parts@sopride.com

Sales: 800-851-8180

Service: 800-437-2679

Service Fax: 618-993-0378

9/09/04

Page 2
Image 2
Southern Pride manual BBR-700-FL VENTING INSTALLATION, Venting, Any Ventilation System Must Be Installed In Accordance