Spalding 21196804 manual Side View

Models: 21196804

1 29
Download 29 pages 31.68 Kb
Page 10
Image 10

6. Fill hole completely with concrete.

3

5

4

1" (2.54 cm)

IMPORTANT!: CONTINUE ON TO NEXT STEP.

DO NOT WAIT FOR CONCRETE TO CURE.

Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

7.

1" (2.54 cm)

NOTE A:

Make a reference mark here for anti-skid tape.

NOTE B:

Keep flange pushed down to concrete and leveled.

1" (2.54 cm)

DRAINAGE HILL

PLAYINGSURFACE

SIDEVIEW

IMPORTANT!: WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

P/N 21196804 10/04

10

Page 10
Image 10
Spalding 21196804 manual Side View