SECTION C: ATTACH THE BACKBOARD & ELEVATOR ASSEMBLY

TO POLE SYSTEM

This is what your system will look like when you’ve finished this section:

TOOLS REQUIRED FOR THIS SECTION

Container to Mix

Phillips-Head

Screwdriver

(2)3/4" Wrenches

AND/OR

(2)Socket Wrenches and Sockets

3/4”

HARDWARE USED IN THIS SECTION (not actual size)

#27

#43#45

#44

#24

#46

#33

#23#39

19

10/04

P/N 21196804

Page 19
Image 19
Spalding 21196804 manual Container to Mix Phillips-Head Screwdriver 4 Wrenches