8.

Fill pole with concrete to approximately 1” (2.54 cm) below bottom elevator hole as shown.

IMPORTANT!:

FAILURE TO FILL YOUR

POLE COMPLETELY WITH

CONCRETE AS

DESCRIBED IN THESE

INSTRUCTIONS WILL

VOID ALL WARRANTIES

WRITTEN AND IMPLIED.

1

IMPORTANT!:

Make sure that concrete does not bulge

from the end of pole assembly. Allow concrete to completely cure.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

P/N 21196804 10/04

24

Page 24
Image 24
Spalding manual 21196804 10/04