9.

Fill pole with concrete approximately 1” (2.54 cm) below bottom elevator hole as shown.

1

IMPORTANT!:

FAILURE TO FILL YOUR POLE COMPLETELY WITH CONCRETE AS DESCRIBED IN THESE INSTRUCTIONS WILL VOID ALL WARRANTIES WRITTEN AND IMPLIED.

IMPORTANT!:

Make sure that concrete does not bulge from the end of pole assembly. Allow concrete to completely cure.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

10. Install net (34).

A.

B.

34

C.

D.

34

29

12/05

ID# M881111

Page 29
Image 29
Spalding M881113, M881117, M881119, M881115, M881111 manual Install net