Spalding M881111, M881117, M881119, M881115, M881113 manual Ide Vie W

Models: M881111 M881113 M881117 M881115 M881119

1 32
Download 32 pages 51.65 Kb
Page 13
Image 13

6. Fill hole completely with concrete.

3

5

4

1" (2.54 cm)

IMPORTANT! CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.

7. Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

1" (2.54 cm)

NOTE:

Make a reference mark here for anti- skid tape.

NOTE:

Keep flange pushed

down to concrete

1" (2.54 cm)

DRAINAGE

HILL

PLAYINGSURFACE

and leveled.

SIDEVIEW

IMPORTANT! WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

13

12/05

ID# M881111

Page 13
Image 13
Spalding M881111, M881117, M881119, M881115, M881113 manual Ide Vie W