ELECTRICAL CONNECTIONS
WARNING
All electrical connections should be made by a qualified electrician.
To reduce the risk of electrical shock,
Use the following steps to connect electrical service to the tumbler:
1.Install a circuit breaker, as close to tumbler as possible. If more than one tumbler is being installed, a circuit breaker should be provided for each tumbler. This will make it possible to disconnect each tumbler for maintenance purposes.
2.a. Connect
b.Turn “off” disconnect switch on tumbler and open junction box.
c.Insert
d.Connect wire leads to disconnect switch.
1 Phase Units: Connect one lead to top left connection point. Connect other lead to top right connection point.
3 Phase Units: Connect one lead to each connection point.
e.Connect a ground wire to PE Busbar, Figure 19, in junction box.
3.Check electrical service phase sequence (three phase only) as follows:
a.Energize electrical service and momentarily start tumbler. Check direction of the cylinder rotation. If cylinder rotates clockwise (viewed from front), phase sequence is correct. If cylinder rotates counterclockwise, proceed with step “b”.
b.Disconnect and reverse any two leads at connections.
4.Close junction box cover and turn “on” disconnect
switch.
DISCONNECT
JUNCTIONSWITCH
BOX
COVER
NAMEPLATE
GUARD
T260IE1A
Figure 18
ELECTRICAL CONNECTIONS
PE |
| PE |
ELECTRICAL BUSBAR | ELECTRICAL | BUSBAR |
DISCONNECT | DISCONNECT |
|
GAS AND STEAM | ELECTRIC | |
MODELS | MODELS |
T277IE1A
Figure 19
M412616 | 41 |