STEP4:Plastic Parts
1.Put the Seat Recline Release Cable (58) on the U Bracket of the Seat Back Frame (5).
2.Install the Gas Cylinder (57) on the Seat Back Frame (5) with one Hex Head Bolt (70), one Flat Washer (76) and one Nyloc Nut (91) by using the wrenches provided (112 & 113).
3.Remove the Button Head Socket Screws holding the clamps of the left and right Release Levers (40) by using the M5 Allen Wrench (115). Install the Release Levers (40) onto the Seat Handle Bars (6) just behind the Hand pulse sensors on each side. Install them at an angle that allows easy access for use, then reinsert and tighten the socket screws removed earlier. Don’t over tighten these screws.
4.Secure the Steel Cables (58 & 59) to the Seat Handle Bar (6) with 2pcs of Velcro Tape. Wrap the tape around the handlebars in places that will be under the beverage holders so they are out of sight.
5.Attach the Pedals (L, R)(116,117) to the Crank Arms (51L, 51R).Tighten with the wrench (113). Remember that the left pedal has a reverse thread and will be threaded onto the Crank arm in a counterclockwise motion. There is an “L” stamped in the end of the threaded post of the left pedal and an “R” in the right. Make sure to tighten the pedals as firmly as you can. It may be necessary to
6.Attach the Drink Bottle Holders (L39 & R38) to the sides of the Seat Handle Bar (6) with four Sheet Metal Screws (105).Tighten with the Phillips Head Screw Driver (114).
HARDWARE
#76. 5/16” x 18 x 1.5T | #91. 5/16” x 6T | #105. 4 x 16mm | #70. 5/16” x |
Flat Washer | Nyloc Nut | Sheet Metal Screw | Hex Head Bolt |
(1 pc) | (1 pc) | (4 pcs) | (1 pc) |
XBR95 Fitness Bike | 8 |